Construction6 min read

How to Write Proposals Faster Without Underquoting

Stop spending hours on estimates that don't convert. Here's a system for faster, more accurate proposals that actually win jobs.

By Miha Matlievski|

You know how it goes. Customer wants a quote. You spend two hours measuring, calculating, looking up material prices. You put together a detailed proposal. You send it over. And then... nothing. They ghost you. Or worse - they come back and say "the other guy was cheaper."

Meanwhile, those two hours could have been billable work. That's the real cost of slow proposals.

The Real Cost of Slow Estimates

Let's break it down. If you spend 3 hours on an estimate and your billable rate is $75/hour, that estimate cost you $225 in lost productivity. If you only close 30% of your bids (which is actually pretty good), you're spending $750 in estimate time for every job you actually win.

But the hidden cost is even worse: speed matters in construction sales too.

When a homeowner requests three quotes, they usually go with whoever responds first - assuming the price is reasonable. Every day you delay sending a proposal, the odds of winning that job drop. By day three, you've probably already lost to someone who got back to them same-day.

The contractors who are growing fast aren't necessarily better builders. They're faster at the proposal game.

Why Proposals Take So Long

The problem usually comes down to three things:

Starting from scratch every time. Every proposal is a blank Word document or a fresh spreadsheet. You're typing the same boilerplate language, the same terms and conditions, the same company description - over and over.

Material pricing chaos. You're checking supplier websites, making phone calls, digging through old invoices. Lumber prices changed again? Time to update everything manually.

Scope creep anxiety. You've been burned before. The customer says "just a small bathroom remodel" and suddenly you're dealing with rotten subfloor, outdated wiring, and code compliance issues. So you pad the estimate. Or you spend extra hours trying to anticipate every possible problem.

Each of these problems has a solution.

The Manual Fix (It's Not Glamorous, But It Works)

Here's how to cut your proposal time in half without spending a dime on software:

1. Build a Proposal Template Library

Create templates for your most common project types. Not just one generic template - build specific ones:

  • Bathroom remodel (basic)
  • Bathroom remodel (full gut)
  • Kitchen update (cosmetic)
  • Kitchen remodel (structural)
  • Deck construction
  • Room addition

Each template should include:

  • Standard scope description
  • Common line items pre-filled
  • Your terms and conditions
  • Your insurance and license info
  • Payment schedule
  • Typical timeline

Now when a bathroom remodel request comes in, you're not starting from zero. You're just adjusting quantities and swapping out a few line items.

2. Create a Pricing Quick-Reference

Build a spreadsheet with your standard prices for common tasks:

  • Install toilet: $350 materials + $200 labor = $550
  • 4x4 tile install (per sq ft): $6 materials + $12 labor = $18
  • Demo existing tile (per sq ft): $0 materials + $4 labor = $4
  • Standard electrical outlet: $25 materials + $75 labor = $100

Update this monthly. Yes, it takes an hour. But that hour saves you 20 hours of looking up prices throughout the month.

3. Use the Three-Tier Pricing Strategy

Stop giving one number. Give three:

Good: Basic scope, standard materials, efficient execution. Better: Same scope, upgraded materials, some extras included. Best: Enhanced scope, premium materials, additional features.

This does three things:

  1. Anchors the customer to the middle option (which is usually what you wanted to charge anyway)
  2. Pre-empts the "can you do it cheaper" conversation
  3. Shows professionalism that justifies higher prices

4. Add Assumptions and Exclusions

The biggest source of underquoting is scope creep. Combat this with explicit assumptions:

This quote assumes:

  • Existing framing is sound and meets code
  • No hazardous materials present (asbestos, lead paint)
  • Electrical panel has capacity for new circuits
  • Permits obtained by owner (or add $X for permit management)

Not included:

  • Structural changes to load-bearing walls
  • HVAC modifications
  • Landscaping repair
  • Interior design services

Now when they ask you to move that load-bearing wall, you're not eating the cost. You're issuing a change order.

5. Implement the 24-Hour Rule

Here's a simple policy that will win you more jobs: respond to every estimate request within 24 hours. Not with a full proposal - just with acknowledgment.

"Thanks for reaching out about your kitchen remodel. I can come by tomorrow at 2pm to take measurements. Does that work? I'll have a detailed proposal for you within 48 hours of our walkthrough."

This shows professionalism, builds trust, and keeps you top of mind while competitors are still "working on the numbers."

The Better Way

All of these manual fixes work. But you're still doing a lot of typing, a lot of calculating, and a lot of back-and-forth. You're still spending mental energy on proposals when you'd rather be building.

This is where automation changes everything.

Imagine walking through a job site, speaking into your phone: "Master bathroom remodel. Demo existing tile and tub. Install walk-in shower with glass door. Replace vanity with double sink. New lighting - four recessed cans plus sconce. Heated floor. Customer wants mid-range materials, timeline flexible."

And within minutes, you have a professional proposal ready to send. Line items populated. Prices calculated based on your historical data. Assumptions and exclusions auto-included. Formatted beautifully on your letterhead.

That's what's possible with AI-powered estimating. The technology captures your voice notes, understands construction terminology, and generates accurate proposals based on your pricing history. It learns what works for your business.

We've seen contractors go from 3-hour estimates to 20-minute estimates. One remodeler told us he went from 4 proposals a week to 4 proposals a day. His close rate actually went up because he was responding faster than anyone else.

Another owner put it this way: "I used to dread Sundays because that's when I'd do all my estimating. Now I knock them out between jobs. Got my weekends back."

The Bottom Line

Your proposal process is either a competitive advantage or a liability. If you're spending hours on estimates that don't convert, you're subsidizing your competitors - they get the job while you do unpaid consulting work.

The manual fixes will help. Templates, pricing libraries, and the 24-hour rule are all free to implement. Start there.

But if you want to really transform your business, look at automation. The time you save on proposals is time you can spend building, marketing, or just being with your family.

Because here's the truth: you didn't get into construction to sit at a desk typing quotes. You got into it to build things. Let systems handle the paperwork so you can do what you're actually good at.

Curious if this could work for your business?

Book a free 45-minute call. We'll talk about your business, find the bottlenecks, and show you what's possible - no pressure.

Book a Free Call